Review Our Lists of Recent Projects Commercial | Public | Residential
- Public Work
• P.S. 88 (S.C.A.) Ridgewood Queens, N.Y. Concrete
Construction Excavation, foundation, concrete slabs, sidewalks, curbs and site work
• P.S. 190 (S.C.A.) Brooklyn, NY Concrete
Construction Super structure, foundation, structural steel, concrete slabs, site work
• George Washington High School (S.C.A.) New York, NY
Construction of temporary classroom facility, foundation, plumbing, electric, entrances, placement of 25 temporary classrooms and site work.
• Bronx Signal Station (M.T.A.) Bronx, N.Y.
Concrete, grade Beams, pile installation, foundation and 100,000 Sq. Ft. Concrete pour in place concrete slabs
• Flushing Park Storm Facility (N.Y.C.D.E.P.)
Installation of piles, steel reinforcing and pour in place 15,000 cubic yards of concrete for three barrel sewer/storm tunnel which included base slabs, walls and roofs.
• Moore Houses (N.Y.C. Housing Authority) Removal and replacement of building entrances for 90 city owned housing buildings through the Bronx including steps, handicapped ramps and sidewalks.
• Lubavitch World Headquarters Brooklyn, N.Y.
Concrete foundation for plaza extension, concrete superstructure, complete interior build-out in plaza area, sidewalks and curbs.
If any further information is required it will be provided upon request.
|